- Production of Crude Oil
Crude oil production during December 2021 was 2509.98 TMT, which is 5.19% lower than target for the month and 1.81% lower than the production of December 2020. Cumulative crude oil production during April-December, 2021 was 22378.40 TMT, which is 4.47% and 2.63% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of December 2021 and cumulatively for April-December 2021 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company |
Target |
December (Month) |
April-December (Cumulative) |
||||||
2021-22 (Apr-Mar)* |
2021-22 |
2020-21 |
% over last year |
2021-22 |
2020-21 |
% over last year |
|||
Target* |
Prod.* |
Prod. |
Target* |
Prod.* |
Prod. |
||||
ONGC |
20272.88 |
1733.83 |
1652.90 |
1700.54 |
97.20 |
15262.19 |
14596.31 |
15209.09 |
95.97 |
OIL |
3182.60 |
278.70 |
254.36 |
241.35 |
105.39 |
2352.31 |
2243.85 |
2226.69 |
100.77 |
PSC Fields |
7718.52 |
634.87 |
602.72 |
614.27 |
98.12 |
5811.27 |
5538.24 |
5547.64 |
99.83 |
Total |
31173.99 |
2647.40 |
2509.98 |
2556.16 |
98.19 |
23425.76 |
22378.40 |
22983.42 |
97.37 |
- Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
- Crude oil production by ONGC (Oil and Natural Gas Corporation) in nomination block during December 2021 was 1652.90 TMT, which is 4.67% lower than target of the month and 2.8% lower when compared with production of December 2020. Cumulative crude oil production by ONGC during April-December, 2021 was 14596.31 TMT, which is 4.36% and 4.03% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less than anticipated production from Cluster-8 fields due to delay in inputs as installation of wellhead platforms got delayed due to Covid impact.
- Loss in oil production in Ratna & R-Series due to due to scaling in wells and delay in H2S package at R-13A wells.
- Less condensate receipt at Hazira due to less gas production from B&S Asset and due to constraints in 36” SBHT line.
- Crude oil production by OIL (Oil India Ltd) in the nomination block during December 2021 was 254.36 TMT, which is 5.39% higher when compared with production of December 2020 but 8.73% lower than target of the month. Cumulative crude oil production by OIL during April-December 2021 was 2243.85 TMT, which is 0.77% higher than the production during corresponding period of last year but 4.61% lower than target for the period. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells and drilling wells.
- Less than planned due to local disturbance & miscreants activities in main producing area (MPA).
- Crude oil production by Pvt/JVs companies in the PSC/RSC regime during December 2021 was 602.72 TMT, which is 5.06% lower than the target of the reporting month and 1.88% lower than the month production of December 2020. Cumulative crude oil production by Pvt/JVs companies during April-December 2021 was 5538.24 TMT, which is 4.7% and 0.17% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- MB/OSDSF/B80/2016 (Hindustan Oil Exploration Company Ltd.): Delay in commencement of production.
- RAVVA (Cairn Energy India Ltd): Production shortfall is due to less water injection in RC-4ST and RC-11z which has caused lower production from producer wells.
- CB-OS/2 ((Cairn Energy India Ltd): Production shortfall is due to Natural decline, increase in water cut observed in aquifer supported pools and Recent sanding/loading issues in the wells.
- CB-ONN-2004/2 (ONGC): Three development wells in VD-3 discovery and one development well in VD-5 discovery could not be drilled as planned in Q1, Q2 & Q3. The production rate of new development well Vadatal#21 is not as expected.
- Production of Natural Gas
Natural gas production during December 2021 was 2896.69 MMSCM, which is 19.45% higher than the production of December 2020 but 14.93% lower than the monthly target. Cumulative natural gas production during April-December 2021 was 25673.90 MMSCM, which is 21.51% higher than production during corresponding period of last year but 8.75% lower when compared with target for the period. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of December 2021 and cumulatively for April-December 2021 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (in MMSCM)
Oil Company |
Target |
December (Month) |
April-December (Cumulative) |
||||||
2021-22 (Apr-Mar)* |
2021-22 |
2020-21 |
% over last year |
2021-22 |
2020-21 |
% over last year |
|||
Target* |
Prod.* |
Prod. |
Target* |
Prod.* |
Prod. |
||||
ONGC |
23335.10 |
2008.98 |
1757.10 |
1857.73 |
94.58 |
17488.56 |
15541.83 |
16544.32 |
93.94 |
OIL |
2949.65 |
251.22 |
240.37 |
201.63 |
119.21 |
2222.91 |
2189.77 |
1869.83 |
117.11 |
PSC Fields |
11834.60 |
1144.96 |
899.22 |
365.57 |
245.98 |
8425.47 |
7942.31 |
2714.81 |
292.55 |
Total |
38119.35 |
3405.16 |
2896.69 |
2424.93 |
119.45 |
28136.95 |
25673.90 |
21128.96 |
121.51 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
- Natural gas production by ONGC in the nomination blocks during December 2021 was 1757.10 MMSCM, which is 12.54% lower than target for the month and 5.42% lower than the production of December 2020. Cumulative natural gas production by ONGC during April-December, 2021 was 15541.83 MMSCM, which is 11.13% and 6.06% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less than planned production from Vasistha /S1 wells in EOA due to certain reservoir related issues.
- Delay in commencement of gas production from U1 field of KG-98/2 Cluster-II due to covid impact as manufacturing of subsea items and well completion got delayed.
- Less production due to decline in Tapti-Daman block.
- Less production in Mandapeta field due to delay in inputs and decline in production from Pasarlapudi & Endamuru fields in Rajahmundry.
- Natural gas production by OIL in the nomination block during December 2021 was 240.37 MMSCM which is 19.21% higher than target for the month and 4.32% lower than the production of December 2020. Cumulative natural gas production by OIL during April-December 2021 was 2189.77 MMSCM, which is 17.11% higher than production during corresponding period of last year but 1.49% lower than target for the period. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells and drilling wells.
- Less offtake by the consumers in main producing area (MPA).
- Natural gas production by Pvt/JVs companies in the PSC/RSC/CBM regime during December 2021 was 899.22 MMSCM, which is 145.98% higher than the production of December 2020 but 21.46% lower than the target for the month. Cumulative natural gas production by Pvt/JVs during April-December 2021 was 7942.31 MMSCM, which is 192.55% higher than production during corresponding period of last year but 5.73% lower than target for the period. Reasons for shortfall in production are as under:
- KG-DWN-98/2 (ONGC): Delay in commissioning of Wells U1-A of KG-DWN-98/2 block. Well U1-2 (U1-B) producing less than the estimated profile.
- RJ-ON-90/1 (Cairn Energy India Ltd): Few Gas wells of RDG field are not producing as per expectations.
- RANIGANJ EAST (Essar Oil and Gas Exploration and Production Ltd.): Shortfall because delay in scheduled operations.
- KG-DWN-98/3 (RIL): Workover job ongoing in well No. AR1-DEV1.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during December 2021 was 21482.88 TMT, which is 2.18% higher than December 2020 but 0.44% lower than the target for the month. Cumulative crude throughput during April-December 2021 was 177215.39 TMT, which is 10.51% higher than the production of corresponding period of last year but 0.97% lower than target for the period. Refinery-wise details of the crude throughput and capacity utilization during the month of December 2021 vis-à-vis December 2020 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of December 2021 and cumulatively for the period April-December 2021vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company |
Target |
December (Month) |
April-December (Cumulative) |
||||||
2021-22 (Apr-Mar)* |
2021-22 |
2020-21 |
% over last year |
2021-22 |
2020-21 |
% over last year |
|||
Target* |
Prod.* |
Prod. |
Target* |
Prod.* |
Prod. |
||||
CPSE |
145812.84 |
12810.22 |
12469.20 |
12141.04 |
102.70 |
107290.52 |
98998.10 |
89728.66 |
110.33 |
IOCL |
70299.81 |
6219.93 |
5904.51 |
5987.56 |
98.61 |
52480.95 |
49399.71 |
44758.56 |
110.37 |
BPCL |
30499.94 |
2410.00 |
2663.74 |
2529.29 |
105.32 |
22620.00 |
21665.07 |
17895.11 |
121.07 |
HPCL |
17199.69 |
1579.58 |
1483.18 |
1284.48 |
115.47 |
11939.77 |
9278.64 |
12025.73 |
77.16 |
CPCL |
10000.00 |
930.00 |
840.14 |
766.27 |
109.64 |
7300.00 |
6134.82 |
5604.29 |
109.47 |
NRL |
2750.35 |
240.17 |
136.55 |
259.78 |
52.56 |
2053.08 |
1930.22 |
1990.51 |
96.97 |
MRPL |
15000.00 |
1425.00 |
1433.92 |
1306.56 |
109.75 |
10850.00 |
10534.36 |
7395.96 |
142.43 |
ONGC |
63.04 |
5.53 |
7.16 |
7.11 |
100.79 |
46.71 |
55.29 |
58.50 |
94.51 |
JVs |
18021.00 |
1536.00 |
1774.71 |
1652.06 |
107.42 |
13554.00 |
15214.50 |
12523.88 |
121.48 |
BORL |
7000.00 |
600.00 |
656.99 |
625.34 |
105.06 |
5250.00 |
5389.97 |
4291.59 |
125.59 |
HMEL |
11021.00 |
936.00 |
1117.72 |
1026.72 |
108.86 |
8304.00 |
9824.53 |
8232.29 |
119.34 |
Private |
78008.07 |
7231.30 |
7238.96 |
7231.30 |
100.11 |
58109.00 |
63002.80 |
58109.00 |
108.42 |
RIL |
60940.96 |
5687.66 |
5528.85 |
5687.66 |
97.21 |
45610.26 |
47825.18 |
45610.26 |
104.86 |
NEL |
17067.11 |
1543.64 |
1710.11 |
1543.64 |
110.78 |
12498.74 |
15177.62 |
12498.74 |
121.43 |
TOTAL |
241841.91 |
21577.52 |
21482.88 |
21024.40 |
102.18 |
178953.52 |
177215.39 |
160361.54 |
110.51 |
- Totals may not tally due to rounding off. *: Provisional
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during December 2021 was 12469.20 TMT, which is 2.66% higher than target for the month but 2.70% lower than the production of December 2020. Cumulative crude throughput during April-December 2021 was 98998.10 TMT which is 10.33% higher than corresponding period of last year but 7.73% lower than target for the period. Reasons for shortfall in production are as under:
- IOCL-Guwahati and Bongaigaon Refinery: Monthly Crude processed lower due to low crude receipts.
- IOCL-Haldia Refinery: Monthly Crude processed lower due to deferment of Crude Distillation Unit-2 (CDU) shutdown from Nov-Dec’21 to Dec’21-Jan’22 and Extension of CDU-2 shutdown.
- IOCL-Mathura, Panipat and Paradip Refinery: Monthly Crude processed in line of products demand.
- BPCL-Kochi Refinery: Monthly Crude processed lower due to lower diesel evacuation during the first fortnight and higher stock of HSHSD as hydro-treating unit charges were limited due to lower amine strength.
- HPCL, Mumbai Refinery: Crude throughput is less due to shutdown of secondary units.
- HPCL, Visakh Refinery: Crude throughput is less due to delay in crude tanker berthing.
- CPCL-Manali Refinery: Monthly Crude processed lower due to poor Bitumen & Petcoke demand leading to Vacuum Residue containment.
- NRL-Numaligarh Refinery: Monthly Crude processed lower due to H2U/HCU (Hydrocracker Unit) and Diesel Hydrotreating (DHDT) shutdown due to HTER-p tube bundle replacement in H2U unit
3.2 JV refineries’ crude oil processed during December 2021 was 1774.71 TMT, which is 15.54% higher than the target for the month and 7.42% higher than December 2020. Cumulative crude throughput during April-December 2021 was 15214.50 TMT, which is 12.25% and 21.48% higher than target for the period and production during corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during December 2021 was 7238.96 TMT, which is 0.11% higher than the corresponding month of last year. Cumulative crude throughput during April-December 2021 was 63002.80 TMT, which is 8.42% higher than the corresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during December 2021 was 22754.72 TMT, which is 5.93% higher than production of December 2020 and 3.27% higher than target for the month. Cumulative production during April-December, 2021 was 186008.63 TMT, which is 10.02% higher when compared with the production of corresponding period of last year but 0.28% lower than target for the period. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of December 2021 and cumulatively for April-December, 2021 vis-à-vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure 4: Monthly Refinery Production of Petroleum Products
Table 4: Production of Petroleum Products (TMT)
Oil Company |
Target |
December (Month) |
April-December (Cumulative) |
||||||
2021-22 (Apr-Mar)* |
2021-22 |
2020-21 |
% over last year |
2021-22 |
2020-21 |
% over last year |
|||
Target* |
Prod.* |
Prod. |
Target* |
Prod.* |
Prod. |
||||
CPSE |
137873.44 |
12100.54 |
11880.30 |
11445.19 |
103.80 |
101428.13 |
93765.34 |
84944.79 |
110.38 |
IOCL |
66984.33 |
5907.05 |
5686.47 |
5756.96 |
98.78 |
50007.34 |
47403.38 |
42921.76 |
110.44 |
BPCL |
29279.04 |
2327.29 |
2530.33 |
2399.72 |
105.44 |
21697.48 |
20715.04 |
17151.93 |
120.77 |
HPCL |
16019.55 |
1467.24 |
1451.21 |
1157.16 |
125.41 |
11110.27 |
8650.98 |
11160.27 |
77.52 |
CPCL |
9279.11 |
864.85 |
787.75 |
683.29 |
115.29 |
6768.27 |
5594.15 |
5130.58 |
109.04 |
NRL |
2749.06 |
240.06 |
127.45 |
256.32 |
49.72 |
2052.12 |
1892.20 |
2014.72 |
93.92 |
MRPL |
13502.33 |
1288.78 |
1290.28 |
1184.93 |
108.89 |
9748.18 |
9456.79 |
6509.45 |
145.28 |
ONGC |
60.02 |
5.27 |
6.82 |
6.80 |
100.19 |
44.48 |
52.79 |
56.08 |
94.13 |
JVs |
16361.00 |
1395.00 |
1624.27 |
1515.95 |
107.14 |
12417.00 |
14103.57 |
11623.20 |
121.34 |
BORL |
6095.00 |
523.00 |
580.11 |
578.73 |
100.24 |
4569.00 |
4794.09 |
3769.93 |
127.17 |
HMEL |
10266.00 |
872.00 |
1044.16 |
937.22 |
111.41 |
7848.00 |
9309.49 |
7853.27 |
118.54 |
Private |
93222.97 |
8146.49 |
8918.13 |
8146.49 |
109.47 |
69302.56 |
75042.98 |
69302.56 |
108.28 |
RIL |
76683.16 |
6610.23 |
7254.40 |
6610.23 |
109.75 |
57172.73 |
60421.67 |
57172.73 |
105.68 |
NEL |
16539.81 |
1536.26 |
1663.73 |
1536.26 |
108.30 |
12129.83 |
14621.30 |
12129.83 |
120.54 |
Total Refinery |
247457.41 |
21642.02 |
22422.70 |
21107.63 |
106.23 |
183147.69 |
182911.89 |
165870.55 |
110.27 |
Fractionators |
4516.39 |
391.71 |
332.02 |
372.66 |
89.09 |
3392.11 |
3096.74 |
3200.42 |
96.76 |
TOTAL |
251973.80 |
22033.74 |
22754.72 |
21480.30 |
105.93 |
186539.80 |
186008.63 |
169070.97 |
110.02 |
Note: Totals may not tally due to rounding off. *: Provisional
- Production of petroleum Products by Oil’s Refineries during December 2021 was 22422.70 TMT, which is 6.23% higher than production of December 2020 and 3.61% higher when compared with target for the month. Cumulative production during April-December, 2021 was 182911.89 TMT, which is 10.27% higher than the production of corresponding period of last year but 0.13% lower than target for the period.
- Production of petroleum Products by Fractionators during December 2021 was 332.02 TMT, which is 15.24% lower than the target for the month and 10.91% lower than production of December 2020. Cumulative production during April-December, 2021 was 3096.74 TMT, which is 8.71% and 3.24% lower than target for the period and production during corresponding period of last year respectively.